Scotch College

Controltech Solutions were engaged in providing an all-inclusive service for Scotch College’s infrastructure upgrade.

PROJECT CHALLENGES

  • Strict 3-week timeframe

  • Ever-changing scope of work

  • Hardened rocky grounds

  • Saturated existing underground services.

PROJECT OUTCOME

  • We engaged our whole team to take care of all service locating, non-destructive digging, directional drilling, excavating, waste disposal, supply and installation of underground communications and electrical pits and conduits, and the breakout and reinstatement of existing surfaces (asphalting and concreting).

 

  • We eliminated the stress of dealing with multiple companies by handling all work internally, which allowed us to be flexible when necessary.

 

  • The site was restored to its original state before the school holidays ended, and our client was impressed with the results.